Day 11 the boys were busy first thing in the morning pumping cement. Over half way there and it was only 10:30 in the morning. I ask the guys how many cement trucks were needed. There were 7 trucks each with 5 cubic metres of cement. There was definitely a lot of cement. I'm all cemented out! Starting to smooth out the slab and remove the timber framing. All done.